Today the sink got hooked up. Jon came over after work and we cut some holes, ran some pipe, and went to Home Depot a couple times fr parts. The faucet and garbage disposal are hooked up, but apparently my GD has a leak, and I need to replace it. Bummer. So after that, I still need him to to do the water lines for the fridge and dishwasher, along with the stove gas pipe. Hopefully none of that is too much time.
Thursday, June 26, 2008
Day 19 - Sink
Today the sink got hooked up. Jon came over after work and we cut some holes, ran some pipe, and went to Home Depot a couple times fr parts. The faucet and garbage disposal are hooked up, but apparently my GD has a leak, and I need to replace it. Bummer. So after that, I still need him to to do the water lines for the fridge and dishwasher, along with the stove gas pipe. Hopefully none of that is too much time.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment