Friday, June 6, 2008

Day 5 - No progress (well..)

No pictures, as nothing changed. David was here to take off the drywall this morning. The electrician came to make sure his work was inspectable, and (more important) to pick up a check from me. The damage on the extra lights and wires was 1300$, so that throws my budget off a bit. Oh well, drop in the bucket so to speak.

I dropped off the plumbing and gas permits at the town hall, and had the inspector do a rough look today. He said we are good, but he wants that galvanized pipe changed to PVC. Otherwise I am ok. I called Jon and he will do that tomorrow. He wants me to help, so I can experience first-hand how messy that can be. I looked and this pipe may be a pain in the butt where it is located, but I'm sure we'll get it done.

I need to get the tile and paint this weekend, since I will be gone all week. I hate offloading this to Jen, but the company is making us go to the big event.

All of the sink stuff and the stove are sitting here waiting still. I hope David will get this all back on track next week.

No comments: