No pictures, as nothing changed. David was here to take off the drywall this morning. The electrician came to make sure his work was inspectable, and (more important) to pick up a check from me. The damage on the extra lights and wires was 1300$, so that throws my budget off a bit. Oh well, drop in the bucket so to speak.
I dropped off the plumbing and gas permits at the town hall, and had the inspector do a rough look today. He said we are good, but he wants that galvanized pipe changed to PVC. Otherwise I am ok. I called Jon and he will do that tomorrow. He wants me to help, so I can experience first-hand how messy that can be. I looked and this pipe may be a pain in the butt where it is located, but I'm sure we'll get it done.
I need to get the tile and paint this weekend, since I will be gone all week. I hate offloading this to Jen, but the company is making us go to the big event.
All of the sink stuff and the stove are sitting here waiting still. I hope David will get this all back on track next week.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment